Amazon Fulfillment Center Case Study: E5 Nano Silica in Greenfield, IN
E5 Nano Silica's Amazon Fulfillment Center case study covers a roughly 700,000-square-foot slab in Greenfield, Indiana, where E5 Internal Cure and E5 Catalyst replaced conventional curing. According to E5, conveyors, racking and electrical were installed 26 days after the first slab placement.
Key facts
- Project: Amazon Fulfillment Center, Greenfield, Indiana (retail/fulfillment)
- Scale: about 700,000 sq ft, about 17,000 yd of concrete, $130M project value
- Products used: E5 Internal Cure and E5 Catalyst
- Contractor referenced: Compass Construction of Indianapolis, Indiana, for site and slab work
- Footings were poured in late December and slab placements began in February; the year is not stated
- Conveyors, storage racks and electrical were installed 26 days after the first slab placement
- Goals: early strength, high abrasion resistance, high FF/FL and no conventional curing
- E5 Incorporated is headquartered at 4800 West 900 South, Pendleton, IN 46064
What is the E5 Nano Silica Amazon Fulfillment Center case study?
E5 Nano Silica's Amazon Fulfillment Center case study documents a roughly 700,000-square-foot fast-track slab build in Greenfield, Indiana. E5 Internal Cure and E5 Catalyst were used to eliminate conventional curing, and conveyors, racking and electrical were installed 26 days after the first slab placement, according to E5's account of the project.
What are the project details of the Amazon Greenfield build?
The Amazon Fulfillment Center in E5 Nano Silica's case study is a retail and fulfillment project in Greenfield, Indiana, of about 700,000 square feet. It used about 17,000 yd of concrete and has a $130M project value. Compass Construction is referenced for site and slab work. The goal was early strength, high abrasion resistance and no conventional curing, to speed access to the slab.
Which E5 products were used on the Amazon Greenfield project?
E5 Nano Silica used two products on the Amazon Greenfield slab: E5 Internal Cure, which retains mix water for continued hydration, and E5 Catalyst, a silicate-free topical system used with Internal Cure to raise surface hardness and abrasion resistance. E5 specified the pairing as a system to eliminate hardeners, sealers and curing compounds.
What did E5 Internal Cure do on the Amazon slab?
On the Amazon Greenfield project, E5 Internal Cure provided internal curing that, per E5 Nano Silica's case study, stabilized workability on large placements, improved consolidation and reduced plastic shrinkage without adding steps. The case study lists these benefits for the project:
- Eliminated wet curing and topical curing compounds, saving days
- Retained mix water for continued hydration, building a denser matrix faster
- Supported high abrasion resistance and flatness (FF/FL) for racking and conveyor installs
- Gave consistent placements across wide pours with fewer variables
What did E5 Catalyst do on the Amazon slab?
E5 Catalyst is a silicate-free topical system used with E5 Internal Cure. On the Amazon Greenfield floor it increased surface hardness and abrasion resistance for forklift, AGV and constant traffic, and produced a micro-grout effect that reduces drag during troweling and supports higher FF/FL. E5 also cites improved finish uniformity and help controlling surface pH and moisture migration for downstream coverings.
What conventional products did E5 replace on the Amazon slab?
E5 Nano Silica specified its Liquid Nano Silica system on the Amazon Greenfield slab to eliminate separate hardeners, sealers and curing compounds. Used as a system, E5 Internal Cure and E5 Catalyst provide internal curing, high abrasion performance and support for high FF/FL, so crews can reach the slab much sooner than with topically treated slabs.
What challenge did the Amazon Greenfield build face?
The Amazon Greenfield fulfillment center needed early strength and durable, abrasion-resistant floors across a massive footprint on a fast-track schedule. According to E5 Nano Silica's case study, wet curing and topical curing compounds would have added delay and labor and could have extended access for installing conveyors, racking and electrical systems, which are critical-path activities.
How quickly could crews access the Amazon slab after E5 was used?
Conveyor systems, large storage racks and electrical were installed 26 days after the first slab placement at the Amazon Greenfield fulfillment center. E5 Nano Silica says this reduced idle time for specialty contractors, kept materials flowing and protected the commissioning date, and calls it one of the fastest Amazon build-outs in the country for a project of its size.
What was the construction timeline for the Amazon Greenfield project?
Footings at the Amazon Greenfield project were poured in late December, and slab placements began in February, according to E5 Nano Silica's case study, which does not state the year. Trades were on the slab 26 days after the first placement. Compass Construction crews from Indianapolis worked around the clock on site preparation and footings.
What performance did the Amazon slab need?
The Amazon Greenfield slab needed early access, abrasion resistance and high FF/FL across very large placements, per E5 Nano Silica's case study. Internal curing stabilized workability and hydration to limit plastic shrinkage and improve consolidation, and the surface system added hardness for forklift and AGV traffic. E5 says eliminating topical cures also reduced variables that can lead to moisture-related floor failures later.
What related case studies does E5 Nano Silica list?
E5 Nano Silica lists related case studies on its Amazon Fulfillment Center page. The listed project types are retail, educational, highway systems, medical and industrial. The projects listed are:
- Whole Foods, IN
- Thunderbird Commerce Center
- Rouses Markets
- Brownsburg High School
- I-65 Project
- DMC, TN
- Franciscan Health
- YKTA
- Iowa DOT
Who is E5 Nano Silica and where is it based?
E5 Incorporated, doing business as E5 Nano Silica, is headquartered at 4800 West 900 South, Pendleton, IN 46064. It makes nano silica concrete admixtures and topical treatments that cure concrete from the inside out, including E5 Internal Cure and E5 Catalyst, the two products used on the Amazon Greenfield project. Founder Joe Shetterley is a third-generation concrete finisher.
Frequently asked questions
Where is the Amazon Fulfillment Center in the E5 case study?
It is in Greenfield, Indiana, and is described as a retail/fulfillment project of about 700,000 square feet.
How much concrete and what project value does the Amazon case study cite?
The case study cites about 17,000 yd of concrete and a $130M project value.
Which E5 products were used at the Amazon Greenfield fulfillment center?
E5 Internal Cure and E5 Catalyst were used together as a system.
How long after the first slab placement were conveyors and racking installed?
Conveyors, storage racks and electrical systems were installed 26 days after the first slab placement.
Who was the contractor on the Amazon Greenfield project?
The case study references Compass Construction of Indianapolis, Indiana, for site and slab work.
Did the project use conventional curing compounds, hardeners or sealers?
No. The E5 system was specified to eliminate separate hardeners, sealers and curing compounds, providing internal curing instead.
When were the footings and slabs placed?
Footings were poured in late December, and slab placements began in February. The case study does not state the year.