Reyes at Thunderbird Commerce Center: E5 Nano Silica Case Study
Reyes at Thunderbird Commerce Center is an August 2023 E5 Nano Silica case study of a 750,000 ft² distribution slab in Indianapolis, Indiana, using 21,500 yd³ of concrete. E5 Internal Cure and E5 Liquid Fly Ash eliminated wet curing and curing compounds, saving 7 days and reducing net CO2 by 501 tons.
Key facts
- Project: Reyes at Thunderbird Commerce Center, a distribution facility slab
- Date: August 2023
- Location: Indianapolis, IN
- Footprint: 750,000 ft²
- Concrete volume: 21,500 yd³
- E5 Internal Cure dosage: 4 oz/cwt, plant-dosed
- E5 Liquid Fly Ash dosage: 8 oz/cwt, plant-dosed
- E5 Catalyst was applied topically by finishing crews for an abrasion-resistant wear surface
- Schedule gain: 7 days saved, with no wet cure or curing compounds
- CO2 reduction: 501 tons net, counting cement manufacturing, transport and E5 manufacturing
- Owner: Reyes Holdings, a privately held food and beverage distribution company based in Illinois
What was the Reyes at Thunderbird Commerce Center project?
Reyes at Thunderbird Commerce Center was an August 2023 distribution facility slab in Indianapolis, Indiana, covering 750,000 square feet and using 21,500 cubic yards of concrete. E5 Nano Silica's E5 Internal Cure and E5 Liquid Fly Ash eliminated wet curing and curing compounds, saved 7 days, and cut net CO2 by 501 tons. The project combined a large footprint, an aggressive schedule and polished-floor expectations.
Who is Reyes Holdings?
Reyes Holdings is a privately held food and beverage distribution company based in Illinois, founded in 1976, and the owner behind the Reyes slab at Thunderbird Commerce Center in Indianapolis. It has over 36,000 employees and operations in 18+ countries. Its three divisions are Reyes Beverage Group, the largest beer distributor in the U.S.; Martin Brower, a global logistics partner for McDonald's; and Reyes Coca-Cola Bottling, serving key U.S. regions.
What challenge did the Reyes project face?
The Reyes slab at Thunderbird Commerce Center had to be a massive, polished-ready logistics slab delivered on a compressed schedule without sacrificing floor flatness and levelness (FF/FL) or long-term durability. Reyes Holdings also targeted quantifiable carbon and waste reductions compared with traditional methods, while minimizing callbacks and maintenance risk in a high-traffic environment.
Which E5 products were used on the Reyes project, and at what dosage?
E5 Nano Silica's Reyes project used plant-dosed E5 Internal Cure at 4 oz/cwt and plant-dosed E5 Liquid Fly Ash at 8 oz/cwt. Finishing crews then applied E5 Catalyst topically to reduce drag and form a harder, denser wear surface suited to high traffic. Together these products formed the E5 system for the slab. E5 Internal Cure kept water available for hydration, eliminated wet curing and topical curing compounds, and improved pumpability and finishability. E5 Liquid Fly Ash is an engineered liquid pozzolan that reduces or offsets cement while stabilizing workability and strengths, and it helps lower embodied CO2 and permeability.
How did E5 affect the schedule on the Reyes project?
On the Reyes slab at Thunderbird Commerce Center, E5 Internal Cure eliminated wet curing and curing compounds, which compressed the schedule by about 7 days while floor quality targets were still met. Removing those steps simplified sequencing, improved pump, place and finish efficiency, and allowed earlier safe access for follow-on trades.
How much CO2 did the Reyes project avoid?
The Reyes project at Thunderbird Commerce Center reduced net CO2 by 501 tons. E5 Nano Silica states this figure accounts for cement manufacturing, transport and E5 manufacturing. E5 Liquid Fly Ash reduced or offset cement, and eliminating wet curing and topical cure and rinse steps saved water. The case study also reports savings in fuel and materials, without giving separate quantities.
What floor performance did the Reyes slab need?
The Reyes slab at Thunderbird Commerce Center needed a polished, logistics-grade floor with consistent FF/FL for long aisle runs and high rack density. It also had to resist abrasion from forklifts and pallet jacks, limit dusting and efflorescence, and keep its appearance under bright lighting. Surface moisture and pH control were important to protect coatings in designated zones while supporting quick trade access. Reduced shrinkage and lower permeability were essential to minimize maintenance and callbacks over the building's lifecycle.
What results did the E5 system deliver on the Reyes project?
E5 Nano Silica reports three results on the Reyes slab at Thunderbird Commerce Center: a 7-day schedule gain with no wet cure or curing compounds; smoother finishing, reduced drag and more consistent FF/FL; and sustainability savings in cement, water, fuel, materials and CO2, including 501 tons of net CO2 avoided. Densification from E5 Internal Cure and E5 Liquid Fly Ash supported flatness and levelness targets for polished surfaces, and E5 Catalyst provided an abrasion-resistant wear layer.
What other E5 case studies are related to the Reyes project?
E5 Nano Silica lists related case studies alongside the Reyes project, grouped by project type: retail, educational and highway systems. The listed studies are the Amazon Fulfillment Center, Whole Foods in Indiana, Rouses Markets, Brownsburg High School and an I-65 case study. E5 also describes a 700,000-square-foot Amazon Fulfillment Center in Greenfield, IN, where E5 Internal Cure and Catalyst were used, allowing conveyor systems, racking and electrical installation just 26 days after the first slab pour.
How can I contact E5 Nano Silica?
E5 Incorporated (E5 Nano Silica) is headquartered at 4800 West 900 South, Pendleton, IN 46064, and can be reached by phone at 1-888-881-1726 or by email at marketing@e5nanosilica.com. The company makes nano silica concrete admixtures and topical treatments, and serves ready-mix producers, general contractors, engineers, architects, finishers, developers and government and DOT agencies.
Frequently asked questions
How large was the Reyes slab at Thunderbird Commerce Center?
The slab covered 750,000 square feet and used 21,500 cubic yards of concrete, on a project in Indianapolis, Indiana dated August 2023.
What E5 dosages were used on the Reyes project?
E5 Internal Cure was dosed at 4 oz/cwt and E5 Liquid Fly Ash at 8 oz/cwt, both plant-dosed. E5 Catalyst was applied topically by finishing crews.
How many days did E5 save on the Reyes project?
The schedule was compressed by about 7 days because wet curing and curing compounds were eliminated, allowing earlier safe access for follow-on trades.
How much CO2 was avoided on the Reyes project?
The project reduced net CO2 by 501 tons, counting cement manufacturing, transport and E5 manufacturing.
Was E5 Catalyst part of the Reyes project?
Yes. Finishing crews applied E5 Catalyst topically to reduce drag and form a harder, denser, abrasion-resistant wear surface suited to high traffic.