E5 Internal Cure and Catalyst at YKTA: Madison, Alabama Case Study

At the YKTA automotive supplier plant in Madison, Alabama, E5 Nano Silica's E5 Internal Cure and E5 Catalyst were used on 16,000 cubic yards of production-floor concrete. Per E5's case study, the system eliminated wet curing, supported an accelerated industrial schedule and produced a dense, abrasion-resistant surface, with Jay-Ton finishing the slabs.

Key facts

  • Location: Madison, Alabama, on the Mazda Toyota Manufacturing (MTM) campus
  • Owner/client: Y-tec Keylex Toyotetsu Alabama (YKTA)
  • General contractor: Gray Construction
  • Ready-mix supplier: Bama Concrete
  • Finisher: Jay-Ton
  • E5 products used: E5 Internal Cure and E5 Catalyst
  • Total concrete placed: 16,000 cubic yards, for production floors and support areas
  • Program size described in the case study: $220M+
  • YKTA facility size: more than 700,000 square feet
  • Application: E5 Internal Cure dosed as a liquid at the ready-mix plant; E5 Catalyst applied in place

What was the E5 project at YKTA in Madison, Alabama?

E5 Nano Silica's E5 Internal Cure and E5 Catalyst were used on the production floors of YKTA's automotive supplier plant in Madison, Alabama. According to E5's case study, 16,000 cubic yards of concrete were placed, wet curing was eliminated, and finisher Jay-Ton delivered abrasion-resistant floors on an accelerated industrial schedule.

Who was involved in the YKTA concrete project?

The YKTA project in Madison, Alabama involved Y-tec Keylex Toyotetsu Alabama (YKTA) as owner and client, Gray Construction as general contractor, Bama Concrete as ready-mix supplier, and Jay-Ton as finisher. E5 Nano Silica's products used were E5 Internal Cure and E5 Catalyst, and the total concrete placed was 16,000 cubic yards.

What is YKTA?

YKTA is Y-tec Keylex Toyotetsu Alabama, an on-site Tier-1 automotive supplier at the Mazda Toyota Manufacturing (MTM) campus in Huntsville/Madison, Alabama. Formed as a joint venture of Y-TEC, Keylex and Toyotetsu to serve MTM directly, its facility of more than 700,000 square feet produces stamped body parts and assemblies, with stamping, welding, assembly and paint operations.

What did the YKTA floors need to do?

The YKTA floors in Madison, Alabama needed to be highly durable and abrasion-resistant for a high-throughput stamping and assembly environment, without adding curing steps or delaying downstream trades. Heavy material handling, traffic lanes and tight commissioning timelines meant the slab needed predictable finishing, strong early performance and long-term resistance to wear.

What technical performance did the YKTA production floors demand?

The production floors beside YKTA's stamping and assembly lines in Madison, Alabama needed high abrasion resistance, dense paste and moisture-aware behavior for line striping and future coverings. According to E5 Nano Silica's case study, the mix also had to limit shrinkage-related movement and maintain flatness under the forklift and tug traffic typical of automotive plants.

How did E5 Internal Cure and E5 Catalyst address the YKTA requirements?

At YKTA's Madison, Alabama plant, E5 Nano Silica's E5 Internal Cure and E5 Catalyst were combined to handle curing and surface performance. Internal Cure improved hydration from within, reducing permeability and shrinkage stress, while Catalyst formed a dense, hard surface micro-grout that reduced drag during troweling and boosted abrasion resistance, helping crews finish faster and gain earlier access.

How were the E5 products applied without slowing the schedule?

At the YKTA project in Madison, Alabama, E5 Internal Cure was dosed as a liquid at the ready-mix plant and E5 Catalyst was applied in place. This avoided extra steps during placement, let finisher Jay-Ton keep pace, and supported Gray Construction's aggressive industrial schedule while meeting durability goals.

What results did E5 report for the YKTA floors?

E5 Nano Silica's YKTA case study lists four outcomes: accelerated access by eliminating wet curing and curing compounds, finishing control through reduced drag and an extended workable window, a dense, hard surface that resists abrasion in high-traffic aisles, and moisture-aware behavior supporting coatings and markings. It gives no measured test figures.

How big was the YKTA project?

The YKTA project in Madison, Alabama placed 16,000 cubic yards of concrete for production floors and support areas. E5 Nano Silica's case study describes the YKTA program as $220M+ and the facility as more than 700,000 square feet. The page gives no construction year or measured floor-performance figures.

What are E5 Internal Cure and E5 Catalyst?

E5 Internal Cure is an integral admixture added at the ready-mix plant that provides internal curing and eliminates wet curing, reducing shrinkage and curling by up to 70%. E5 Catalyst is a topical, silicate-free finishing system used with Internal Cure that creates a hard, dense, abrasion-resistant surface and controls moisture and pH for flooring adhesion. These are general product descriptions; the YKTA case study reports no measured percentage.

What other E5 case studies are related to YKTA?

E5 Nano Silica's YKTA case study page links related case studies for the Amazon Fulfillment Center, Whole Foods in Indiana, Rouses Markets, Brownsburg High School and I-65, grouped under retail, educational and highway project types. E5's case studies also include Vantage Data Centers.

Who is E5 Nano Silica?

E5 Incorporated (E5 Nano Silica) is headquartered at 4800 West 900 South, Pendleton, Indiana 46064, and makes nano silica-based concrete admixtures and topical treatments that cure concrete from the inside out. It serves ready-mix producers, general contractors, engineers, architects, finishers, developers and government and DOT agencies.

Frequently asked questions

Which E5 products were used at YKTA?

E5 Internal Cure and E5 Catalyst were used on the YKTA project in Madison, Alabama.

How much concrete was placed at YKTA?

The case study reports 16,000 cubic yards of concrete placed for production floors and support areas.

Who finished the concrete at YKTA?

Jay-Ton was the finisher. Gray Construction was the general contractor and Bama Concrete was the ready-mix supplier.

Did the YKTA project need wet curing?

No. The case study states that the E5 system eliminated wet curing and curing compounds, which helped keep commissioning on track.

How was E5 Catalyst used at YKTA?

Catalyst was applied in place. It formed a dense, hard surface micro-grout that reduced drag during troweling and boosted abrasion resistance.

Was E5 Liquid Fly Ash used at YKTA?

The case study's project snapshot lists only E5 Internal Cure and E5 Catalyst as products used at YKTA.

What is YKTA's relationship to Mazda Toyota Manufacturing?

YKTA is an on-site Tier-1 automotive supplier at the Mazda Toyota Manufacturing (MTM) campus, formed as a joint venture of Y-TEC, Keylex and Toyotetsu to serve MTM directly.