Episode 11 of The Concrete Podcast: Unifying the Industry, from E5 Nano Silica, is a live audience Q&A recorded in Alexandria, Minnesota. Joe Shetterley and Joel Cookston discuss Type 1L cement, bleed rate and finishing timing, curing, water control, durability, E5 Internal Cure, E5 Liquid Fly Ash and communication across the concrete supply chain.
Key facts
- Episode 11 of The Concrete Podcast: Unifying the Industry was recorded live in Alexandria, Minnesota, as the podcast's first live audience event.
- The episode was published on the E5 blog on August 14, 2026.
- The hosts are Joe Shetterley (founder and CEO of E5) and Joel Cookston (Chief Business Officer).
- The event was made possible with support from Concrete Solutions.
- Topics include Type 1L cement, bleed rate, finishing timing, water demand, curing, durability, surface issues and admixture compatibility.
- The episode discusses E5 Internal Cure and E5 Liquid Fly Ash.
- Joe Shetterley is a third-generation concrete finisher who began experimenting with nano silica in 2014-2015 after owning Trace Construction in Indiana.
- E5 Internal Cure is added at the ready-mix plant and has been tested by a third-party lab as qualifying as a concrete curing compound under ASTM C156-20.
- E5 Incorporated is headquartered at 4800 West 900 South, Pendleton, IN 46064, USA.
What is Episode 11 of The Concrete Podcast about?
Episode 11 of The Concrete Podcast: Unifying the Industry, from E5 Nano Silica, is a live audience Q&A recorded in Alexandria, Minnesota. Joe Shetterley and Joel Cookston answer audience questions on Type 1L cement, finishing timing, water demand, curing, durability, surface issues and admixture compatibility. It was the podcast's first live audience event. The audience asked about surface delamination and scaling, plastic shrinkage cracking, finishing problems, curing methods and admixture behavior. The discussion also covers the origins of E5 Nano Silica and the need for better communication across the concrete supply chain.
Who supported the Alexandria live event and how was it run?
Episode 11 was recorded live in Alexandria, Minnesota, as the first live audience event for The Concrete Podcast: Unifying the Industry, and was made possible with support from Concrete Solutions. It was run as an open forum rather than a scripted presentation or sales pitch, and the E5 blog published it on August 14, 2026. The audience included people who place, produce, specify and work with concrete, so the questions came directly from the field.
How did E5 Nano Silica start, according to Episode 11?
In Episode 11, E5 founder Joe Shetterley, a third-generation concrete finisher, says E5 Nano Silica came from field experience rather than theory. Chris Wolf, a ready-mix technical director, introduced him to early colloidal silica; Joe was skeptical, tested it on surface issues, saw effects on finishing and water control, then studied it seriously. Joe describes growing up in the field and building a concrete company that poured significant annual volume. He says problems he saw earlier in his career increased as supplementary cementitious materials, curing compounds and changing cement systems became more common. E5's company profile places his nano silica experiments in 2014-2015, after he owned Trace Construction, one of the largest commercial concrete construction companies in Indiana. The episode describes E5's field-first approach as proving a product under real working conditions before asking other finishers to trust it.
Why does Episode 11 say modern concrete has become more complicated?
Episode 11 says concrete has become more complicated because cement chemistry has shifted, especially toward Type 1L cement, changing bleed rates, set timing, surface feel, abrasion resistance and finishing behavior. Contractors trained on older systems may find that what worked with Type I cement does not work the same way with Type 1L. The episode names different limestone contents, new grinding aids and modern admixture packages as factors. Its point is that when materials change but field education does not, the risk often lands on the people finishing the concrete.
How does Type 1L cement affect bleed rate and finishing timing?
Type 1L cement can change finishing timing because higher limestone content may alter bleed rate and set behavior. In Episode 11, Joe Shetterley says the industry has seen concerns about slower bleed rates, water reducer performance, abrasion resistance and surface durability. Bleed rate matters because it influences when finishers can safely work a slab. If bleed water is trapped beneath the surface, delamination, scaling and weak surface layers can follow. If the surface looks ready before internal moisture behavior has caught up, crews may begin finishing too soon. Joe warns against treating every surface issue as a simple finishing mistake, since the cause may be mix chemistry, water balance, cement fineness, limestone content or admixture compatibility.
Is curing the concrete better always the answer to surface failures?
No. Episode 11 of The Concrete Podcast argues that 'cure it better' does not always solve concrete failures. Joe Shetterley says temperature and moisture control are critical, but many surface problems begin inside the concrete system, and curing compound or wet cure applied at the wrong time may not fix the root cause. He notes that applying wet cure or curing compound too early can interfere with bleed water and surface behavior. On overlays, he still supports wet cure because thin sections need temperature control. His position is that curing should be understood as part of a larger system, not a blanket excuse or a one-size-fits-all fix.
What does E5 Internal Cure do, as discussed in Episode 11?
E5 Internal Cure is E5 Nano Silica's integral admixture, added at the ready-mix plant, that provides internal curing. In Episode 11, Joe Shetterley explains it helps hold more water inside the concrete matrix, supporting hydration and a denser internal structure, using nano-sized particles designed to fit between cement grains. The episode says those particles influence how water moves through the concrete, and frames the goal as helping concrete control water more effectively, not replacing good practices. Too much water can weaken the system, while too little usable water can contribute to workability problems, dehydration, cracking and poor surface development. E5's product information adds that E5 Internal Cure eliminates wet curing, reduces shrinkage and curling by up to 70%, and has been tested by a third-party lab as qualifying as a concrete curing compound under ASTM C156-20.
How do particle packing and density relate to concrete durability?
Particle packing describes how efficiently materials of different sizes fit together, and better packing can make concrete denser and less porous. In Episode 11, Joel Cookston and Joe Shetterley explain that E5 works within the paste by adding very small silica particles that fill space, influence water movement and support hydration. Concrete contains coarse aggregate, fine aggregate, cement particles and paste. The episode says that by helping keep water and particles in place, E5 can support stronger particle packing, improved density and better durability outcomes, provided the rest of the mix design and placement process are handled correctly.
What does Episode 11 say about E5 Liquid Fly Ash?
E5 Liquid Fly Ash is a liquid nano silica product, not traditional fly ash. In Episode 11, Joe Shetterley says it was developed after recurring problems with fly ash availability, air stability and consistency, and it is presented as a tool that can enhance SCM strategies, not a one-for-one replacement in every situation. The episode describes it as helping create some of the performance effects associated with supplementary cementitious materials while supporting better consistency and stability in certain mix designs. It can support mix adjustments when producers want better consistency, hydration behavior and field performance. E5's product information describes it as a silicate-free nano silica pozzolan that reduces or replaces cement and SCMs.
Why does communication between contractors, producers and engineers matter?
Episode 11 says communication is the central industry problem: contractors, ready-mix producers, engineers and cement and admixture suppliers often protect themselves rather than share information, so problems repeat. Joe Shetterley argues for transparency, shared field data, honest technical discussion and listening across disciplines instead of finger-pointing. He recalls that as a contractor his best ready-mix relationships worked because the producer cared about what the finisher needed, and they talked about aggregate changes, material changes, timing and field performance. After entering the broader industry he saw a fractured system: contractors blame producers, producers blame finishers, engineers rely on specifications, and suppliers may not fully explain material changes.
Why does finishability matter if concrete meets its strength requirement?
Finishability matters because concrete can meet its required PSI and still be hard to place, finish, cure or maintain. Episode 11 stresses that a mix that is sticky, closes quickly or traps bleed water leaves the contractor carrying risk, and finishers are often blamed for variables they do not control. Joe Shetterley calls finishers the last line of defense for good concrete, since they are the last people to touch it. The episode concludes that finishability, workability, timing, moisture behavior and surface durability should be part of the conversation from the beginning of a project.
What practical lessons does Episode 11 give contractors and producers?
Episode 11 of The Concrete Podcast offers five practical lessons: do not assume old finishing habits still apply, understand the mix before blaming the crew, reduce unnecessary variables, communicate before the pour, and treat concrete as a system. Each reflects the episode's theme of sharing information across the concrete supply chain. First, modern materials may require different timing, tools, curing decisions and finishing methods. Second, surface issues can connect to cement chemistry, bleed rate, water reducer performance, water demand, vibration, curing timing or aggregate behavior. Third, overcomplicated admixture packages can make problems harder to diagnose. Fourth, contractors and ready-mix producers should discuss expectations, weather, timing, mix behavior, risk and jobsite conditions before the truck arrives. Fifth, performance depends on materials, proportioning, batching, delivery, placement, finishing, curing, temperature, water movement and long-term exposure.
Who is E5 Nano Silica, the company behind the podcast?
E5 Incorporated (E5 Nano Silica) makes nano silica-based concrete admixtures and topical treatments that cure concrete from the inside out, reducing shrinkage, improving durability and mitigating moisture. It is headquartered at 4800 West 900 South, Pendleton, IN 46064, USA, and produces The Concrete Podcast. E5 serves ready-mix producers, general contractors, engineers, architects, finishers, developers and government and DOT agencies. Joe Shetterley is its founder and CEO, and Joel Cookston is its Chief Business Officer. The product line includes E5 Internal Cure, E5 Liquid Fly Ash, E5 Shot Cure, E5 Catalyst, E5 Miracle Aid, E5 Shield and E5 Protect. The company phone number listed on its website is 1-888-881-1726.
Frequently asked questions
Where was Episode 11 of The Concrete Podcast recorded?
Episode 11 was recorded live in Alexandria, Minnesota, as the first live audience event for The Concrete Podcast: Unifying the Industry, with support from Concrete Solutions.
Who speaks in Episode 11?
Joe Shetterley and Joel Cookston of E5 Nano Silica lead the episode and answer questions from a live audience of contractors, ready-mix producers, engineers and other concrete professionals.
What topics does Episode 11 cover?
It covers the origins of E5 Nano Silica, Type 1L cement, bleed rate and finishing timing, water demand, curing, durability, surface issues, admixture compatibility, particle packing, E5 Internal Cure, E5 Liquid Fly Ash and communication across the supply chain.
Does Episode 11 say E5 Liquid Fly Ash replaces fly ash one-for-one?
No. The episode says E5 Liquid Fly Ash is not presented as a simple one-for-one replacement in every situation. It is described as a tool that can enhance SCM strategies and support consistency and stability in certain mix designs.
Who introduced Joe Shetterley to colloidal silica?
According to Episode 11, Chris Wolf, a ready-mix technical director who built concrete mixes around what finishers needed in the field, introduced him to early colloidal silica technology.
When was Episode 11 published?
The episode was published on the E5 blog on August 14, 2026.
Where is E5 Nano Silica headquartered?
E5 Incorporated is headquartered at 4800 West 900 South, Pendleton, IN 46064, USA.